Description
A podcast about battery energy storage and the Polish renewable energy market — no marketing fluff, just real examples and verified information.
We cover the entire BESS project lifecycle: development, permitting, EPC, commissioning, optimization, and O&M. Benefits, risks, real costs, investor mistakes, and how to spot a reliable contractor.
Universal BESS insights plus Polish market specifics — for investors entering storage business or companies looking to cut energy costs with C&I solutions.
Hosted by Jerzy Kuźmiński
We cover the entire BESS project lifecycle: development, permitting, EPC, commissioning, optimization, and O&M. Benefits, risks, real costs, investor mistakes, and how to spot a reliable contractor.
Universal BESS insights plus Polish market specifics — for investors entering storage business or companies looking to cut energy costs with C&I solutions.
Hosted by Jerzy Kuźmiński
21 Episodes
Reverse
The same BESS suppliers bid in Poland, Germany, Italy and Romania, with the same containers, the same datasheets and the same promises. Every one of them is the market leader, every offer looks identical, and investors still compare above all the price per kilowatt-hour. The real differences are deep in the containers, where nobody actually looks..In this episode, we return to supplier selection, this time from the technology side. We start with who you are really talking to: an integrated manufacturer, a system integrator or a white-label brand, and what "Tier 1" actually means. Then we go down to the cells: why the cell manufacturer can change between versions of the same offer, how cells are graded, why their production date matters and who actually tests them. We look at the small print next to degradation curves, why a round-trip efficiency above 90% at the medium voltage metering point is not achievable, and why auxiliary consumption in July can be twice the datasheet value. We explain how cell balancing in LFP affects what your optimiser can do, and cover cooling, fire protection, build quality, PCS and MV stations. Finally, what happens after signing, when you really see what kind of supplier you have chosen.Questions or support with a BESS project: [email protected] | www.greenedge-solutions.com
Polish storage projects are moving from development into execution, and the market is not ready for it. In the twentieth episode of GreenEdge - Best in BESS, I go through everything between energisation and the day a storage system starts earning money in Poland. That covers the Polish requirements on top of NC RfG, the prerequisites for the supplier’s commissioning team, cold and hot commissioning, system integration, FAT, SAT, PAC and FAC, and the first day of operation, when the contractor leaves and somebody has to open the gate.In this episode I follow a storage project through the months that decide whether it starts earning on time: from the Polish operator’s requirements, through a supplier’s team arriving on a site that is not quite ready and integration tests where everyone blames someone else, to the acceptance documents you sign and the first service visit that ends at a locked gate.Questions or support with a BESS project in Poland: [email protected] | www.greenedge-solutions.com
The storage system has passed its tests at takeover, the contractor has left the site, the optimiser is waiting for data, and the balancing revenue that the financial model assumed from day one is still not coming in. Each party has done its part under its own contract, and the investor is left alone with the problem. In Poland, qualification for balancing services sits at the interface of three parties, the asset owner, the EPC or balance of plant contractor and the optimiser, and none of them has it fully within its own scope.In this episode we walk through the qualification process under the Polish balancing rules (WDB), based on the studies we have prepared on this topic. We explain why grid connection compliance tests cannot replace the verification tests PSE requires for a battery storage system. We show when qualification is lost and what triggers requalification, why changing your optimiser means a new process, and what a firmware update has to do with it. We look at what sits with the contractor and what sits with the DUB, why a home-market optimiser cannot simply bring its integrations to Poland, and what you as the investor have to prepare on your side to connect the storage system to the optimiser’s node. Finally, six steps to align the EPC contract, the optimiser contract and the LTSA, so you are not left alone with the problem.Questions or looking for support on a BESS project in Poland? [email protected] | www.greenedge-solutions.comLooking to extend this knowledge further, or get your whole team aligned on it? Visit the training tab on our website to learn more about our BESS training programme.https://greenedge-solutions.com/en/bess-training/
Who is the producer of the batteries in your BESS project? Most investors would point to the cell manufacturer in China or the integrator whose logo is on the container. Under the EU Battery Regulation, it is very often the Polish SPV that owns the project, and with that role comes the obligation to organise and finance the collection and recycling of the batteries once they become waste.In this episode I explain who counts as importer and producer under Regulation 2023/1542 and what the importer has to do before the containers reach the site. I also cover the Polish obligations that still apply because the new national act has not been adopted. We look at why the choice between FOB and DDP largely decides where these obligations land, why an EPC contractor can become a producer without knowing it, and why modules replaced after the warranty are a closer risk than decommissioning in fifteen years. Finally, I list the questions to add to your due diligence when you buy, finance or sell a project in Poland.Questions or looking for support on a BESS project in Poland? [email protected] | www.greenedge-solutions.comLooking to extend this knowledge further, or get your whole team aligned on it? Visit the training tab on our website to learn more about our BESS training programme.https://greenedge-solutions.com/en/bess-training/
EPC Contract for your BESS Project is not something that you will sign within a week or two. There are tens of pages of provisions that someone needs to verify and adjust to your expectations. In this episode I walk through the EPC contract chronologically - from why your RFP quality directly determines your contract quality, through scope of works and the site security system, SCADA and schedule, to the FAT/SAT/PAC/FAC acceptance sequence, performance guarantees, and penalty structure. Looking at it from both perspective, because a fair contract has to work for the investor and the contractor alike. I close with something that is especially important for a foreign investor executing this contract in Poland - governing law, dispute resolution, and the local practicalities a standard EPC playbook does not cover.Questions or looking for support on a BESS project in Poland? [email protected] | www.greenedge-solutions.comLooking to extend this knowledge further, or get your whole team aligned on it? Visit the training tab on our website.https://greenedge-solutions.com/en/bess-training/