DiscoverSmart Charge by RiDERgy
Smart Charge by RiDERgy
Claim Ownership

Smart Charge by RiDERgy

Author: Claudio Geyken

Subscribed: 1Played: 15
Share

Description

Smart Charge by RiDERgy brings you to the forefront of fleet electrification, energy management, and sustainability. Hosted by the RiDERgy team, this podcast dives into the intersection of technology, mobility, and energy.

Each episode delivers actionable insights, expert perspectives, and real-world solutions for fleet managers, sustainability enthusiasts, and industry professionals.

Explore smart charging strategies, grid optimization, EV innovation, and fleet strategies while engaging with industry leaders to uncover opportunities in the electrified future.
49 Episodes
Reverse
Die größte Nutzergruppe der softwaregesteuerten Rufbusse von MWM Solutions im ländlichen Brandenburg sind Menschen zwischen dreißig und fünfzig, also die, von denen man erwarten würde, dass sie alle mit dem Auto fahren. Jannis Mossmann, Geschäftsführer von MWM Solutions, erklärt On-Demand-Verkehr als Teil des öffentlichen Nahverkehrs: Rufbusse, die dort fahren, wo ein Linienbus sich nicht mehr trägt.Jannis erzählt, wie er als Chauffeur und Koordinator von Fahrdiensten zu MWM kam und wie aus der Dispositionsarbeit für Großveranstaltungen wie die Berlinale für Audi der Einstieg in den On-Demand-Verkehr wurde. Er erklärt, was On-Demand-Verkehr bedeutet, warum viele durch Fördergeld gestartete Projekte nach zwei, drei Jahren wieder eingestellt wurden und wie MWM im Raum Storkow und in Schenkendöbern fährt: sieben Fahrzeuge, davon fünf elektrisch. Gebucht wird per App, per Telefon oder über eine KI-Hotline, bis zu sieben Tage im Voraus, die mediane Wartezeit liegt nach seiner Schätzung bei rund 25 Minuten. 25 Prozent der Fahrten sind Anschlussfahrten zu Bus oder Bahn, und drei Viertel der Fahrgäste fahren danach nicht mit Bus oder Bahn weiter: MWM erreicht Menschen, die den öffentlichen Nahverkehr vorher nicht genutzt haben.Dann geht es um die Frage, wie Mobilität neu gedacht werden kann: um autonomes Fahren als nächsten Schritt für softwaregesteuerte Verkehre, um Nahverkehrspläne im Fünfjahreszyklus und um eine Kreisverkehrsgesellschaft, die darüber nachdenkt, Bus und On-Demand-Verkehr gemeinsam auszuschreiben und jedem Einwohner innerhalb von 20 Minuten ein Mobilitätsangebot zu sichern. Zum Schluss erzählt Jannis, wie MWM früh mit Elektromobilität in Kontakt kam: Für die Berlinale mit Audi baute das Team in einem Hangar in Tempelhof 120 Ladepunkte und 14 temporäre Supercharger für 120 Audi e-tron auf, für 14 Tage. Ein Jahr später reichten acht Supercharger am Potsdamer Platz. Außerdem spricht er darüber, wie MWM ohne Fremdkapital profitabel gewachsen ist und mit KI eigene Cockpits für den Betrieb baut.Eine Folge über flexible Mobilität auf dem Land, und darüber, was es braucht, damit sie dauerhaft trägt.
With 500 players on each side of the market, connecting everyone to everyone takes 250,000 bilateral integrations, and every one of them needs a handshake, testing and maintenance. Jakob Kleihues, co-founder of ENAPI, argues that connectivity between charge point operators and mobility service providers should be a free commodity, and that the real money is in financial clearing.Jakob explains why connecting to hundreds of partners one by one does not scale: with 500 players on each side of the market, that is 250,000 bilateral integrations, and every one of them needs a handshake, testing and maintenance. ENAPI replaces them with a single connection. Since it started onboarding, it has connected more than 450 partners and over one million charge points, with implementation times that rarely exceed one or two weeks. He also shows why even a fee of five cents per session pushes volume towards direct connections, and how brokering the transaction lets ENAPI check invoiced charge detail records against the sessions it authorized.The conversation also covers the practical side of pricing, from discounts applied at charge detail record level instead of a flat reduction on the invoice to the new booking module in OCPI 2.3, and what it takes to keep a published 99.998 percent uptime with a very small team where more than 94 percent of production code is written by AI. Jakob explains why the US, Australia and New Zealand followed network by network rather than country by country, and why he wants the industry to think about the size of the pie rather than the slice.An episode about turning connectivity into a commodity, and about what it takes to make public charging simply work.Topics covered:OCPI and why bilateral integrations do not scaleFree connectivity and the business case for financial clearingValidating charge detail recordsDiscounts, variable prices and the booking moduleUptime and AI native engineeringGrowing network by network into the US
The grid map of the Netherlands is almost entirely red for new connections, and that matters far less if you are flexible. Jaap Burger, who has worked on electric vehicle grid integration for over fifteen years, argues that flexibility is what decides whether electrification is affordable, and that the industry keeps arguing for it instead of demonstrating it.Jaap started at the city of Amsterdam on its first public on-street charge points, at a time when the roles of charge point operator and mobility service provider were not yet clearly separated and roaming meant operators emailing each other spreadsheets of identifiers and charge data records. He has been freelance for eleven years, and since 2015, when he helped build smart charging on a connected car API linked to a utility's trading desk, his work has moved steadily towards grid integration and European policy. He describes his role as translating for policymakers what innovators can already do, and translating back to the market what regulation could actually do for them. He arrived for this conversation from Utrecht by electric coach, with a single charging stop at a truck charging hub near Hanover.The conversation gets specific. Jaap argues that expensive public charging is a cost problem before it is a pricing problem: permitting, planning, grid connections, hardware and software set the price an operator must ask, which shapes utilisation, revenue and bankability, and therefore how fast that operator can scale at all. He makes the case that not every peak is equally bad, that a charging peak coinciding with local solar production can help the grid, and that some early demand charges inside network tariffs flatten one peak only to create a bigger one later. On the Netherlands, he explains how a grid map that is almost entirely red for new connections coexists with distributed flexibility from single vehicles reaching the flexibility market, with a new mechanism opening this autumn at low voltage level, and what it took to get there: operators, an MSP platform and grid operators demonstrating it at scale. He is measured on vehicle to grid, which works today in captive fleets with one carmaker, one operator and one source of data, and warns that the excitement around it obscures the larger near term value of unidirectional smart charging. He also covers the German pass through model, real time price endpoints from operators to mobility service providers, the non discriminatory pricing requirement in the European alternative fuels infrastructure regulation, and the fragmentation of roughly 800 distribution grid operators in Germany.An episode about the gap between what flexibility can already do and what the rules currently reward, and about what fleets and operators need from each other to close it.
Die eigenen E-LKW sind mindestens neun Stunden am Stück unterwegs, und genau in dieser Zeit steht der teure Ladepark am Depot leer. Katrin Herda, bei der TST Gruppe verantwortlich für Ladeinfrastruktur, Photovoltaik, Batteriespeicher und Energiemanagement, hat daraus ein Ladenetz gemacht: Die Logistiker öffnen ihre Depots füreinander, statt weiter auf das öffentliche Netz zu warten.Die TST Gruppe ist ein eigentümergeführtes Familienunternehmen, seit 36 Jahren am Markt, gestartet mit einem einzigen LKW und heute bei 85 Standorten, 120 Fahrzeugen und über einer Million Quadratmeter Lagerfläche, spezialisiert auf Pharma und Chemie. 31 Fahrzeuge fahren bereits elektrisch, rund ein Viertel des Fuhrparks, mit einem Verbrauch zwischen 1,0 und 1,3 Kilowattstunden pro Kilometer je nach Jahreszeit, und Katrin benennt den Fahrer als den größten einzelnen Hebel dabei. Öffentlich hat TST zeitweise bis zu 81 Cent pro Kilowattstunde bezahlt, am eigenen Depot sind es 32 Cent netto. Genau daraus ist Dragonize entstanden, das Ladenetz der Logistiker: Die eigenen Trucks sind mindestens neun Stunden unterwegs, in dieser Zeit steht der teure Ladepark leer, und andere Spediteure suchen genau dann eine verlässliche Säule.Dahinter hängt deutlich mehr als eine Ladesäule. Katrin erklärt, warum das Teilen von Strom an der Ladeinfrastruktur einen Logistiker nicht automatisch zum Energieversorger macht, was die Eichrechtskonformität dabei verlangt, und warum sie sieben Dienstleistern dasselbe technische Setup vorgelegt und sieben unterschiedliche Planungen zurückbekommen hat, von den Kabelquerschnitten bis zum Preis. Sie rechnet die Lastspitze vor, die kaum jemand einkalkuliert: Wer eine Säule mit 400 Kilowatt im November unter Volllast in Betrieb nimmt, zahlt diese Spitze für das gesamte Jahr, und zwar fünfstellig. Dazu kommen ein frisch in Betrieb genommener Batteriespeicher mit 6 Megawatt, die Umstellung der Energiebeschaffung von einem festen Tranchenmodell auf ein gemanagtes Portfolio, der Unterschied zwischen statischer und dynamischer Reservierung, und ihre klare Position zum bidirektionalen Laden: Bei zweischichtigem Betrieb fehlt schlicht die Standzeit, und Truck OEMs haben ihr das bestätigt.Eine Folge darüber, wie eine Branche sich selbst hilft, statt auf Infrastruktur zu warten, und darüber, was ein Logistiker wissen muss, bevor der erste E-LKW im Hof steht.
An Spitzentagen verlassen rund 200 LKW das Paketzentrum Ludwigsfelde, und selbst wenn Strom da wäre, gäbe es keinen Platz, sie dort zu laden. Andreas Mündel, der bei der DHL Group in der Konzernstrategie die Dekarbonisierung des Geschäfts verantwortet, erklärt, warum die Elektrifizierung schwerer LKW längst kein Fahrzeugproblem mehr ist, sondern ein Infrastruktur- und Stromproblem.DHL hat sich ein wissenschaftlich validiertes Zwischenziel von 29 Millionen Tonnen CO₂ für 2030 gesetzt, ausgehend von über 32 Millionen Tonnen im vergangenen Jahr. Gut zwei Drittel der Emissionen stammen aus der Luftfahrt, an zweiter Stelle steht der Straßenverkehr und dort vor allem der Schwerlastverkehr. Bei den Zustellfahrzeugen elektrifiziert DHL seit über einem Jahrzehnt und hat das Last- und Lademanagement damals selbst programmiert, weil es kein passendes gab. Beim LKW ändert sich die Größenordnung: ein E-LKW entspricht beim Laden etwa 80 Zustellfahrzeugen, ein ladendes Depot landet schnell bei 5 Megavoltampere, und schon zehn Prozent elektrifizierte LKW würden den heutigen Energieverbrauch verdoppeln. In Deutschland verteilt sich die Antwort darauf auf knapp 900 Verteilnetzbetreiber mit jeweils eigenen Regeln, von "können wir reservieren" bis "kommt 2030 wieder", weshalb Andreas eine Positivliste der Standorte führt, an denen überhaupt genug Strom verfügbar wäre. Der zweite Engpass ist banaler: Platz. Aus dem Paketzentrum Ludwigsfelde gehen an Spitzentagen 200 LKW raus, und Stellplätze für 200 ladende LKW gibt es dort nicht.Damit hängt die Elektrifizierung an Geschäftsmodellen, die es so noch nicht gibt. Andreas spricht mit Betreibern künftiger Ladeparks über Grundlastgarantien: DHL belegt acht von zehn Ladepunkten verlässlich und bekommt dafür einen günstigeren Tarif, statt des festen Zapfpreises aus der Tankstellenlogik. Strom muss dafür bei etwa 37 bis 39 Cent liegen, nicht bei den rund 70 Cent an der Autobahn, und der größte Teil des Business Case kommt ohnehin aus der eingesparten Maut. Reservierbare Ladeslots für LKW existieren bislang nicht, und für Subunternehmer fehlt ein sauberes Modell, wie sie den grünen Strom nachweisen, den sie auf DHLs Rechnung laden: Zertifikate für sie zu kaufen verbietet das europäische Regelwerk. Bei der Reihenfolge wird Andreas deutlich: erst Peak Shaving und Batteriespeicher, dann die zeitliche Verschiebung über den Preisanreiz, erst später die Umplanung des Logistiknetzwerks selbst. Bidirektionales Laden sieht er dagegen nicht in absehbarer Zeit, weil bis dahin ohnehin genug stationäre Speicher stehen, aus denen er zuerst zieht. Dazu kommen der Range Extender, ein vollwertiger E-LKW, bei dem ein Batteriemodul einem kleinen Dieselgenerator weicht, Battery Swapping aus einem chinesischen Minenbetrieb, und die Beobachtung des Physikers, dass die Summe aller lokal optimierten Standorte nicht das Optimum des Gesamtsystems ist.Eine Folge über die harten physikalischen Grenzen hinter einem weichen Ziel, und darüber, wie der Moment aussieht, in dem niemand mehr überzeugt werden muss, weil der Elektro-LKW schlicht der günstigere ist.
loading
Comments