Welcome to the Data Center Infrastructure Podcast.

Every data center starts as a piece of dirt with a power line and a dream. Eric Sonner (Data Airflow) and Lance Teel (Atlas Energy) launch the Data Center Infrastructure Podcast and walk you through the part of the AI buildout almost nobody explains, the mechanical systems that keep billions of dollars of compute alive. New episodes every Monday. The Data Center Infrastructure Podcast is brought to you by Data Airflow, mechanical engineering, procurement, and commissioning for hyperscale AI and HPC data centers.
15 Episodes
Reverse
The Unity Nuclear Battery is a one megawatt reactor that ships sealed, runs for about five years, and goes back to a factory when the fuel is spent. Its builders went from first discussions to criticality at Idaho National Laboratory in 155 days.Eric Sonner and Lance Teel sit down with Bobby Gallagher, CEO and co-founder of Deployable Energy in Houston. Bobby is a fourth generation member of the Australian military who built protection systems for armored vehicles, then moved to South Korean shipyards to build offshore drilling rigs, then brought his family to the United States to build and sell an offshore technology company. In 2022 he turned to nuclear.Bobby explains his design in plain terms. Instead of one big pressure vessel, the core is hundreds of small pressure tubes. Unpressurized cold water slows the neutrons and helium carries the heat out. Bobby says that removes both the steam explosion risk and the hydrogen risk, and that the system shuts itself down and radiates its heat if cooling stops. The final cooling system can be a closed loop with air cooling, so the plant does not evaporate water to make power. The sealed unit lands on an eight inch concrete pad. There is no fuel handling, no waste handling, and no spent fuel storage on site. A crew swaps the container and the factory does the rest.The conversation also covers the milestones Bobby is proudest of. A full life cycle demonstration at Idaho National Laboratory. A civilian nuclear maritime demonstrator, which Bobby says makes Deployable the first private company given that honor. A plan that starts on the inland waterways and moves toward island communities that need power, hot water, cold water, and fresh water from one source. Bobby shares his targets for the cost of power, the 340,000 square foot Houston factory he wants to scale, and his answer to the question every data center developer asks. Can I get one by 2030? He says yes, and he is honest that fuel supply is the tight spot until then.Bobby closes with advice that has nothing to do with reactors. His grandfather told him not to follow his passion, but to follow what he is good at, because it becomes his passion. And when you are young, say yes to nearly everything. When you are older, say no to nearly everything. He also tells the story of driving the reactor from Houston to Idaho on an open truck, against the advice of 70 to 80 percent of his own people.If you use your phone, you use a data center. This show exists to help you understand what's good, what's bad, and what it takes to build them right.New episodes every Monday. Subscribe and turn on notifications.Watch on YouTube. https://youtu.be/gfbc8vh9buYWebsite. https://dirttodatapodcast.comApple Podcasts. https://podcasts.apple.com/us/podcast/data-center-infrastructure-podcast/id6799820255Spotify. https://open.spotify.com/show/0344qx3SJhse3TFPCHDyJcDirt to Data is presented by Data Airflow, mechanical engineering, procurement, and commissioning for hyperscale AI and HPC data centers.
Oil wells bring up natural gas, and where there’s no pipeline, that gas gets flared or vented. Ryan Clark wants to turn it into AI compute.Eric and Lance sit down with Ryan Clark, founder of E4 Core Solutions and owner of Crawford County Oil in Illinois. Ryan is the reason Eric got into this industry. In 2015, his 2 megawatt Bitcoin mine in Moses Lake ran at 115 degrees until Eric helped fix the cooling. Later the two built Tesseract modular data centers out of shipping containers in a Garden City warehouse.Ryan explains flaring versus venting, the EPA’s Quad O methane rules, and why producers will need a useful purpose for stranded gas. His answer is on-site power and modular compute at the wellhead, starting with a 2 megawatt pilot. Plus coal bed methane, how Six Sigma cut his well failures from 2.2 to 0.17 per well per year, running companies on EOS, and the time reporting every drop of spilled oil put him in front of state regulators.His advice closes the show. Passion is not what makes you start. It’s what makes you start again.If you use your phone, you use a data center. Get to know what’s good and what’s bad.Watch on YouTube. https://youtu.be/dVlSb85BYzcMore at https://dirttodatapodcast.com
A coal plant in northern Arizona once employed about a thousand people before it shut down. Gordon and Cindy Baier are building a multi-gigawatt energy and data center campus next to it.Eric and Lance sit down with the show’s first married couple. Gordon is a German energy engineer and Cindy is a former science teacher. They met in Berlin, and on a 2015 Arizona road trip Gordon spotted high voltage lines in the middle of nowhere. After screening more than 30 sites nationwide, they chose Gigawatt Land, up to 100,000 acres near Holbrook.Gordon explains same point interconnection, a planned 25-mile redundancy ring, and energy storage that can’t catch fire. The couple describes a campus built as a circular economy. Data center heat and turbine CO2 will feed a neighboring algae farm, raised solar panels will shade grazing cattle, and the data centers will sit out of view in earth-toned buildings under protected night skies.Cindy closes with advice for women entering the industry. Go for it, learn the material, and believe in yourself.If you use your phone, you use a data center. Get to know what’s good and what’s bad.More at https://dirttodatapodcast.com
Steve Wood ran 2 MW of Bitcoin miners in the basement of a closed paper mill and piped their heat into a 600,000 square foot building. The mill stopped buying 200,000 gallons of propane a winter. Now he’s building AI data centers on the same idea.Eric Sonner and Lance Teel talk with the Idaho farm kid turned Keystone founder about auditing at Coopers & Lybrand, 13 years building plants for Pyrotek, and the 2016 Bitcoin pitch his paper mill turned down. Then they get into industrial symbiosis. Liquid cooling captures about 75 percent of a data center’s heat today, so a 100 MW site has roughly 70 MW to give to greenhouses, fish hatcheries or a town pool. Steve explains why you ask the community what it wants before you build, and what he’s planning on 200 MW at Gigawatt Land with Gordon Baier.Plus karaoke in Japan, career advice for the next generation of builders, and Steve’s charity pick, Tip of the Spear.
Before a data center runs a single AI workload, somebody has to try to break it. Mitch Dec is that somebody.Eric and Lance sit down with Mitch Dec, VP of Commercial Services at Data Airflow, who leads commissioning on some of the largest AI data centers in America. Mitch walks through commissioning from Level 0 to Level 5, from factory testing to cutting power on purpose to prove the backup paths work. He also explains how to test a direct-to-chip AI hall before any servers arrive.The water discussion covers the energy and water tradeoff, how new refrigerants let closed loop systems match open loop efficiency, why the glycol in these systems is food grade and not a forever chemical, and the payback that convinces investors. Plus how Mitch and Eric went from a phone call to a signed proposal in under 36 hours, a 500 person town hall in Appalachia, and why your power bill may have gone up years before the data center arrived.Mitch’s advice closes the show. Every degree has a place in this industry, and so do the trades.If you use your phone, you use a data center. Get to know what’s good and what’s bad.Watch on YouTube. https://youtu.be/N7zhj4MhEOgMore at https://dcipodcast.com