DiscoverThe ZEBx PodcastA Deep Retrofit in West Vancouver – A 1929 Home Leaps Ahead to 2032. The ZEBx Decarb Lunch, Sep 25, 2024
A Deep Retrofit in West Vancouver – A 1929 Home Leaps Ahead to 2032. The ZEBx Decarb Lunch, Sep 25, 2024

A Deep Retrofit in West Vancouver – A 1929 Home Leaps Ahead to 2032. The ZEBx Decarb Lunch, Sep 25, 2024

Update: 2024-10-28
Share

Description

Season 4, Episode 9


Recorded on Sep 25, 2024




Overview


We all know that deep retrofits of detached homes are rare. They are also essential in decarbonizing the built environment.  


This is why we’re excited to showcase this West Vancouver home in our second Decarb Lunch of September 2024. The building, originally constructed in 1929, has been transformed to such a degree that if it were newly built today, it would nearly meet the highest standards of the Zero Carbon and Energy Step Codes. It has achieved this by disconnecting from the gas grid, adding a high-performance building envelope and installing an electric heat pump for both heating and cooling.  Listen in to hear more about the challenges and successes of this unique project.  


Thanks to the financial support of ⁠⁠BC Hydro⁠⁠ and the ⁠⁠City of Vancouver⁠⁠, this event was free of charge.




Resources


Slides ⁠⁠⁠here⁠⁠⁠




Speakers


Erica Wolowidnyk, EW Architecture 
Bradley Jones, Alchemy Construction 




Host


Natalie Douglas, Program Manager, ZEBx


Barb Silverthorn, Capture Energy




Podcast Production:


Gordon Patrick Newell, Communications at ZEIC

Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

A Deep Retrofit in West Vancouver – A 1929 Home Leaps Ahead to 2032. The ZEBx Decarb Lunch, Sep 25, 2024

A Deep Retrofit in West Vancouver – A 1929 Home Leaps Ahead to 2032. The ZEBx Decarb Lunch, Sep 25, 2024

ZEBx: The Zero Emissions Building Exchange