DiscoverThe Atomic ShowAtomic Show #321 – Andrew Harmon, VP Natura Resources
Atomic Show #321 – Andrew Harmon, VP Natura Resources

Atomic Show #321 – Andrew Harmon, VP Natura Resources

Update: 2024-09-27
Share

Description



The US Nuclear Regulatory Commission issued a construction permit on September 16, 2024 to Abilene Christian University (ACU) to build a molten salt research reactor. This marked the first university research reactor approval in 30 years. It is the first liquid fuel reactor ever approved for construction by the NRC and only the second advanced reactor approved since the NRC was created in 1974.







Aside: The first advanced reactor construction permit was issued to Kairos for its Hermes in December 2023. End Aside







Natura Resources is the technology supplier for the important new facility. Andrew Harmon, Natura Resources Vice President of Operations and Business Development visited the Atomic Show to fill in some of the backstory about the project origins, the decision to pursue a research reactor as a step towards their ultimate goal of supplying a large number of factory-produced 100 MWe molten salt reactors, some of the major successes and challenges along the way and the level of community support that the project has attracted.







Developing a major new technology in a heavily regulated industry takes more time and resources than many might imagine. In this case, it involved a consortium that includes four major university partners, an enthusiastic group of local donors, a driven energy entrepreneur with a career spent moving expeditiously and safely, a supportive Department of Energy and a growing team of innovative engineers and developers. It also required significant cooperation and engagement with the NRC.







I’ll stop there and let Andrew fill in the details. I think you will enjoy this show. Please participate in the comment section. Respectful discussion and debate are welcome.








Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Atomic Show #321 – Andrew Harmon, VP Natura Resources

Atomic Show #321 – Andrew Harmon, VP Natura Resources

Rod Adams - Atomic Insights