Understanding LODs in BIM – Time, Cost, and Practical Applications


Welcome to BIM Insights, the podcast where we dive deep into the world of Building Information Modeling. I'm your host, and today, we're tackling a topic that often stirs discussions in the AEC industry – Level of Development or LOD. Specifically, we’ll explore how LODs impact project timelines, costs, and why not every project requires an LOD 400 model. We’ll also break down the importance of LOD 500 and, in certain cases, how teams can jump from LOD 300 straight to LOD 500 without needing fabrication-level detail.


In future episodes, we’ll dive into how these LODs play out in architectural, structural, and facade disciplines, but for today, let’s focus on the core concepts.



Comments 
loading
In Channel
Smart Facade BIM

Smart Facade BIM

2024-11-1515:48

BIM Australia

BIM Australia

2024-10-1808:37

00:00
00:00
1.0x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

LODs in BIM – Time, Cost

LODs in BIM – Time, Cost

Ehsan Mokhtary