DiscoverAsk Paul | National Electrical CodeLet’s Ask Paul Podcast | Episode 203 | Green Insulated Conductor Between Meter and Service?
Let’s Ask Paul Podcast | Episode 203 | Green Insulated Conductor Between Meter and Service?

Let’s Ask Paul Podcast | Episode 203 | Green Insulated Conductor Between Meter and Service?

Update: 2025-02-19
Share

Description

In this episode, Paul was asked to comment on an installation that inspectors are forcing the installation of a green bonding conductor between the meter enclosure and the service equipment. Since a neutral is already connected at each end of this installer, as permitted in 250.142 and as required by 250.24, the question being raised is about the parallel paths for return current and the pesky objectionable current argument.

Well, on this episode I dig into both and give my opinion. Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, discusses electrical code, electrical trade, and electrical business-related topics to help electricians maximize their knowledge and industry investment.

If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visit https://fasttraxsystem.com for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet.

Become a supporter of this podcast: https://www.spreaker.com/podcast/ask-paul-national-electrical-code--4971115/support.
Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Let’s Ask Paul Podcast | Episode 203 | Green Insulated Conductor Between Meter and Service?

Let’s Ask Paul Podcast | Episode 203 | Green Insulated Conductor Between Meter and Service?

Paul W. Abernathy