DiscoverUnBuild It Podcast139 - Roof framing, thermal bridging, and Cold climate wall worries
139 - Roof framing, thermal bridging, and Cold climate wall worries

139 - Roof framing, thermal bridging, and Cold climate wall worries

Update: 2025-09-04
Share

Description

The boys start with a really cool problem-solving involving a monopoly framing, big overhangs, and thermal bridging. And the follow-up is an excellent question from Western Canada regarding the use of ZIP sheathing with a Class I interior vapor retarder. It's a great discussion involving R-values, air barriers, vapor permeability (including all Classes of vapor retarders), wetting, and drying. Whew! Good thing that Steve had a "great" joke to close this one out...(gag).

 PETE'S RESOURCES:

- GBA: "Calculating Thermal Bridging in a Wood-Framed Building:" 

- BuildingScienceAdvisor: 

- GBA "Can Polyethylene Be Used As An Air Barrier?"

www.mbricotiledecks.com/

Comments 
loading
In Channel
loading
00:00
00:00
1.0x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

139 - Roof framing, thermal bridging, and Cold climate wall worries

139 - Roof framing, thermal bridging, and Cold climate wall worries

Unbuild It Podcast