DiscoverEnergy Talks#76: Partial Discharge Monitoring on Gas-Insulated Switchgear and Lines
#76: Partial Discharge Monitoring on Gas-Insulated Switchgear and Lines

#76: Partial Discharge Monitoring on Gas-Insulated Switchgear and Lines

Update: 2024-04-04
Share

Description

Learn about the importance of monitoring PD activity in GIS and GIL for reliable risk assessment.

Partial discharge (PD) activity in Gas-Insulated Switchgear (GIS) and Gas-Insulated Lines (GIL) is a reliable indicator that a fault is developing in the insulation, and immediate action is needed to prevent a potential catastrophic failure.


Since PD accelerates the aging and deterioration of insulation in GIS and GIL, the continuous online monitoring, trending, and diagnosis of PD activity play a critical role in assessing the insulation condition and the risk of failure throughout the equipment’s lifetime.


In this episode, OMICRON PD expert Caspar Steineke discusses what causes PD activity in GIS and GIL and when PD monitoring is best applied to closely observe its development.


Caspar also explains how the latest scalable PD monitoring solution for GIS and GIL from OMICRON, PARADIMO 100, enables highly reliable failure risk assessment through defect classification and alerts users when to take action to prevent a failure. Lastly, Caspar describes how PD monitoring gives users greater peace of mind about the insulation condition of their GIS and GIL.


Learn more about PD monitoring on GIS/GIL: Online PD Monitoring of GIS


Listen to Caspar Steineke talk about The Essentials of Partial Discharge Testing in Energy Talks episode 72.


We would really like to know what you think about Energy Talks and which topics you would like to hear more about. To do this, simply send us an email to podcast@omicronenergy.com and be sure to give us a star review on Spotify or Apple Podcast. Thanks for your feedback!

Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

#76: Partial Discharge Monitoring on Gas-Insulated Switchgear and Lines

#76: Partial Discharge Monitoring on Gas-Insulated Switchgear and Lines

OMICRON electronics GmbH