DiscoverCCNS UpdateAlarming Problems with Proposed Tritium Venting at LANL
Alarming Problems with Proposed Tritium Venting at LANL

Alarming Problems with Proposed Tritium Venting at LANL

Update: 2025-07-30
Share

Description

To prepare for a public meeting with the U.S. Defense Nuclear Facilities Safety

Board (“the Board”) in Santa Fe on Monday evening, CCNS followed its policy of

reviewing at least the last eight weeks of the Board’s reports for Los Alamos National

Laboratory (LANL) and used that as a basis for questions and comments to present to

the Board. What we found:

Comments 
loading
In Channel
loading
00:00
00:00
1.0x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Alarming Problems with Proposed Tritium Venting at LANL

Alarming Problems with Proposed Tritium Venting at LANL

CCNS