Comparing Brownfield and Greenfield Approaches for a New Plant with Andreas Temmen at ZF Group
Description
On this episode, Andreas Temmen, Head of Production at ZF Group, joins host Benjamin Brockmann to talk about the following topics:
-Specific approaches to building new factories when deciding whether to go brownfield or greenfield.
-The connections and challenges of raising up two new plants simultaneously in Mexico and China.
-The types of decisions Andreas faces when finding a new location to build or take over a plant.
-A high-level look at the similarities between going brownfield and greenfield.
-The importance of finding employee number one for a new plant.
-Learning from working in the mother plant before going to a new plant.
-The value of cardboard engineering to ensure a new plant is laid out properly.
-Using 3D glasses to get a realistic picture of a new plant during construction.
Andreas Temmen - https://www.linkedin.com/in/andreas-temmen-5138586a/
CF Group - https://www.linkedin.com/company/zf-group/
If you enjoyed today’s show, please leave a 5-star review. For more information and links to all of the resources mentioned in today’s episode, visit operations1.com.
#operations #manufacturing #industrialautomation