DiscoverThe Straight FlushEp. 26 - Closing of the Chesapeake-Elizabeth Treatment Plant Series: Design and Implementation (Pt. 2)
Ep. 26 - Closing of the Chesapeake-Elizabeth Treatment Plant Series: Design and Implementation (Pt. 2)

Ep. 26 - Closing of the Chesapeake-Elizabeth Treatment Plant Series: Design and Implementation (Pt. 2)

Update: 2023-05-30
Share

Description

This is the final episode of a three-part series documenting the closure HRSD's Chesapeake-Elizabeth Treatment Plant in December 2021. In this episode, our series host Ryan Radspinner (HRSD) continues his conversation with Laura Kirkwood (HRSD),  Jeff Scarano (HRSD), and Michael Hess (HRSD) to discuss the design, stakeholder engagement, construction, and complex field measures taken to close the treatment plant. This episode was recorded in March 2022.

Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Ep. 26 - Closing of the Chesapeake-Elizabeth Treatment Plant Series: Design and Implementation (Pt. 2)

Ep. 26 - Closing of the Chesapeake-Elizabeth Treatment Plant Series: Design and Implementation (Pt. 2)

VWEA