DiscoverZion Oil & Gas PodcastEpisode 17 - Interview with VP Operations, Monty Kness, and Zoran Veselinovic, Senior Drilling Engineer in Israel
Episode 17 - Interview with VP Operations, Monty Kness, and Zoran Veselinovic, Senior Drilling Engineer in Israel

Episode 17 - Interview with VP Operations, Monty Kness, and Zoran Veselinovic, Senior Drilling Engineer in Israel

Update: 2021-04-14
Share

Description

Interview with Monty Kness, VP Operations, and Zoran Veselinovic, Senior Drilling Engineer (in Israel), on the latest press release from April 12, 2021. Further understanding and discussion on hitting the second drilling milestone and the specific challenges that have been overcome to move forward.

Mention was made of the latest investment opportunity in Zion. Learn more about our latest limited Unit Program here.
References the latest Press Release.  Website: www.zionoil.com || (Apologies for the audio issues. We are working to fix this for future episodes.)
FORWARD-LOOKING STATEMENT: This podcast contains forward-looking statements. Statements in this communication that are not historical fact, including, but not limited to, statements regarding Zion’s operations; Zion’s ability to continue as a going concern; operational risks in ongoing exploration efforts; the timing and completion of the processing, interpretation of the results and plans contingent thereon off the 3-D seismic survey; regulatory approvals needed for the rig’s operation; the effect, if any, of the coronavirus pandemic on the timing of the operation of the well, and liquidity for shareholders on OTCQX are forward-looking statements as defined in the “Safe Harbor” provisions of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are based on assumptions that are subject to significant known and unknown risks, uncertainties, and other unpredictable factors, many of which are described in Zion’s periodic reports filed with the SEC and are beyond Zion’s control. These risks could cause Zion’s actual performance to differ materially from the results predicted by these forward-looking statements. These risks and uncertainties include, but are not limited to, those described in Item 1A in Zion’s Annual Report on Form 10-K, which is expressly incorporated herein by reference, and other factors as may periodically be described in Zion’s filings with the SEC. Zion can give no assurance that the expectations reflected in these statements will prove to be correct and assumes no responsibility to update these statements.
Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Episode 17 - Interview with VP Operations, Monty Kness, and Zoran Veselinovic, Senior Drilling Engineer in Israel

Episode 17 - Interview with VP Operations, Monty Kness, and Zoran Veselinovic, Senior Drilling Engineer in Israel

Zion Oil & Gas, Inc.