DiscoverRNZ - All ProgrammesExcavator breaks through 235m tunnel on Mt Messenger project
Excavator breaks through 235m tunnel on Mt Messenger project

Excavator breaks through 235m tunnel on Mt Messenger project

Update: 2025-10-28
Share

Description

A significant milestone has been reached in the Mt Messenger Bypass Te Ara o Te Ata project on State Highway 3 in Taranaki. RNZ Taranaki Whanganui reporter Robin Martin reports.
Comments 
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Excavator breaks through 235m tunnel on Mt Messenger project

Excavator breaks through 235m tunnel on Mt Messenger project