DiscoverIRIE FMJPS says redesign and rebuilding of its infrastructure will be required to restore power to western Jamaica
JPS says redesign and rebuilding of its infrastructure will be required to restore power to western Jamaica

JPS says redesign and rebuilding of its infrastructure will be required to restore power to western Jamaica

Update: 2025-11-23
Share

Description

President and Chief Executive Officer of the Jamaica Public Service (JPS), Hugh Grant says the redesign and rebuilding of its infrastructure will be required, to restore power to western Jamaica. This follows the devastation caused by category 5 Hurricane Melissa on October 28.


The post JPS says redesign and rebuilding of its infrastructure will be required to restore power to western Jamaica appeared first on IRIE FM.

Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

JPS says redesign and rebuilding of its infrastructure will be required to restore power to western Jamaica

JPS says redesign and rebuilding of its infrastructure will be required to restore power to western Jamaica

Natalie Campbell