DiscoverSound of Green - Stories from Denmark's green transitionNKT: Beating the (cable) drum for a green grid
NKT: Beating the (cable) drum for a green grid

NKT: Beating the (cable) drum for a green grid

Update: 2025-10-22
Share

Description

In this episode we visit cable manufacturer NKT at their factory in Asnæs, Denmark, where giant cable drums lie coiled with the infrastructure of the future.

While wind turbines and electric vehicles often steal the spotlight of the green transition, none of them would function without one thing: cables.

Comments 
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

NKT: Beating the (cable) drum for a green grid

NKT: Beating the (cable) drum for a green grid