DiscoverWater BreakThe Water Break Podcast, Episode 46: Package Plant Retrofit From Failure to Success
The Water Break Podcast, Episode 46: Package Plant Retrofit From Failure to Success

The Water Break Podcast, Episode 46: Package Plant Retrofit From Failure to Success

Update: 2025-07-28
Share

Description

“Where we bridge the gap between water plant operators and engineers”


In today’s episode, we are going to talk about a challenging packaged sanitary wastewater treatment plant retrofit.


Ibrahim Teres


We are thrilled to welcome back our guest Ibrahim Teres, a senior process engineer at EMCO group with 10+ years in the water and wastewater treatment systems design field. Ibrahim was recently elected as the vice chairman for the AZ Water Association’s water treatment committee and holds a Bachelor’s degree in Environmental Sciences and a Master’s degree in Environmental Engineering.


Ibrahim has successfully designed, executed, and started up numerous municipal and industrial water and wastewater treatment projects. His expertise spans across diverse sectors including beverage, food processing, and oil & gas industries.


Before moving to Arizona, Ibrahim worked on projects located in the middle east and Africa, thus bringing in a wealth of international experience and a proven track record of delivering innovative and effective water treatment solutions to his new role.


Comments 
In Channel
loading
00:00
00:00
1.0x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

The Water Break Podcast, Episode 46: Package Plant Retrofit From Failure to Success

The Water Break Podcast, Episode 46: Package Plant Retrofit From Failure to Success

Heather Jennings, PE