DiscoverThe LatitudeUnder the hood of a novel virtual power plant
Under the hood of a novel virtual power plant

Under the hood of a novel virtual power plant

Update: 2024-02-20
Share

Description

We have 60 gigawatts of virtual power plant capacity in the US. But that needs to triple in the next decade to support a zero-carbon grid – while also meeting a surge in peak demand.

There are lots of different models for building VPPs that link together solar, batteries, EV chargers, and smart thermostats. Sunrun and PG&E tested a model this summer that uses solar and batteries to create a “permanent load shift” to offset the evening peak in California.

It provided tens of megawatts of capacity to the utility. But there were also some issues with batteries not delivering the expected output. What do the results tell us what it will take to make VPPs a core piece of utility operations?

In this edition: Editor Lisa Martine Jenkins presents a story from the pages of Latitude Media on some surprising results from PG&E and Sunrun’s virtual power plant pilot

For more of Latitude Media’s coverage of the frontiers of clean energy, sign up for our newsletter.

Learn more about your ad choices. Visit megaphone.fm/adchoices

Comments 
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Under the hood of a novel virtual power plant

Under the hood of a novel virtual power plant

Latitude Media