DiscoverNew York City News Today | 2 Min News | The Daily News Now!East River Tunnel Renovation: Progress Update
East River Tunnel Renovation: Progress Update

East River Tunnel Renovation: Progress Update

Update: 2025-12-11
Share

Description

Amtraks East River Tunnel Overhaul: Progress and ChallengesAmtraks East River Tunnel, opened in 1910, is undergoing a major overhaul of its two water-damaged tubes (1 and 2) due to Hurricane Sandys impact in 2012. Tube 2 is set to reopen in July 2026, followed by Tube 1 in the fall of 2026. Despite operating at 75% capacity, the project shows progress with old concrete demolished, original benchwalls removed, and new concrete and conduits installed. Long Island Rail Road President Rob Free acknowledges the good progress and efforts to mitigate disruptions, maintaining a 96.3% on-time performance.

DNN | The Daily News Now!

The world’s first global local news network.

Every city. Every story. AI powered. 


Hosted on Acast. See acast.com/privacy for more information.

Comments 
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

East River Tunnel Renovation: Progress Update

East River Tunnel Renovation: Progress Update