In this Uptime Spotlight, Joel Saxum discusses the C1 Wedge Connection with Managing Director of C1 Connections, Jasper Winkes. They explore how this innovative wind turbine foundation interface addresses challenges in the expanding offshore wind industry, especially for larger turbines. The design benefits include structural enhancements, faster installation, lower maintenance needs, and possible cost savings for both offshore and onshore wind projects.







Sign up now for Uptime Tech News, our weekly email update on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard's StrikeTape Wind Turbine LPS retrofit. Follow the show on FacebookYouTubeTwitterLinkedin and visit Weather Guard on the web. And subscribe to Rosemary Barnes' YouTube channel here. Have a question we can answer on the show? Email us!







Pardalote Consulting - https://www.pardaloteconsulting.comWeather Guard Lightning Tech - www.weatherguardwind.comIntelstor - https://www.intelstor.com















Joel Saxum: I'm Joel Saxum filling in Allen Hall's shoes as your host for this innovation focused guest episode of the Uptime Wind Energy podcast. Today we're talking about wind turbines and massively important connections in between the towers and transition pieces. Bolted L flange have been used for decades to connect steel cylindrical structures.







We know this. However, as the wind industry continues to push structural engineering limits with increased capacity for these behemoth wind turbines, specifically offshore, a need for new tech to solve the loading problems has emerged. Enter stage the C1 Wedge Connection. With over seven years of development and two years in the field Jasper Winkes and team have developed the next generation of steel structure connections. Jasper, welcome to the show.







Jasper Winkes: Thank you very much for having me.







Joel Saxum: Great. So we, you and I talked a little bit off air about kind of the technology where it's been, where it's coming, where it's going, but it's driven by offshore industry trends, right? We've all seen, if you look in the North sea, small turbine big, Bigger, all of a sudden now we're 15 megawatts and some people around the world are talking about what could be the next generation.







What are those trends that are driving your technology?







Jasper Winkes: Yes, indeed. As you mentioned, we've seen a massive growth in turbine size over the years. And on one hand, that's of course the growth of the rotor. And they always say the rotor is the motor. So you need large rotors to extract energy from the wind.







But of course, large rotors also require tall towers. So we see that there's an exponential increase in overturning moments over the past years whereby essentially the bolted L flange...
Comments 
In Channel
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

C1 Connections: The Innovative Wind Turbine Foundation Interface

C1 Connections: The Innovative Wind Turbine Foundation Interface

Allen Hall, Rosemary Barnes, Joel Saxum & Phil Totaro